For additional field definitions see Bill of Material.
To add a new Bill of Material (BOM) to the system
1. At the Finished Good Item field, enter the item group for the finished goods item. Select the item from the Select An Item window.
If you are uncertain of the item code, see Navigating Net Yield - Selecting an Item.
2. If the finished goods item does not have a BOM, the system will ask whether you want to create the BOM based on another finished goods item with a BOM. A "Profile like another? No/Yes" command line option will appear. This is a fast way to create BOMs for several finished goods items that are produced from the same raw materials and other raw materials. Once the BOM is set up for one item, that profile can be used to create the BOMs for the other finished goods items.
If you are uncertain of the item code, see Navigating Net Yield - Selecting an Item.
3. At the Raw Material Item field, enter the item group and select the raw material item that will be used to produce the finished goods item. The COOL level, the default COOL identity and stocking unit of measure will appear.
If you are uncertain of the item code, see Navigating Net Yield - Selecting an Item.
4. At the Source field select the Source type for the item. A Select An Option window will appear, allowing you to define this product as:
Work in-Process type item cannot be added to the BOM. Non-Stocked items can be added as ORM Actual or Standard only.
5. After you have entered your last component onto the BOM press Enter.
Command options will appear:
6. Select Update to save the BOM.
Important: Your changes will not be saved unless you select Update.
For more information on the Bill of Material option see Using Bill of Material.
Security Required : Inventory - Bill of Materials
See Also |